top of page

Post shutdown optimization 

Learn how operational adjustments from Shape Aura led to reduction in energy consumption, improving overall gas plant efficiency.

On August 27th, 2024, the plant experienced a shutdown. Once the plant stabilized on August 30th, 2024, Shape Aura issued recommendation #169 to adjust Main B and Reinjection to a more optimal operating point. 

Shape Aura case
Shape Aura case

On September 1st, 2024, the operational adjustments outlined in recommendation #169 were initiated, and the implementation was confirmed as complete on September 4th, 2024. 

Shape Aura case

Main B flawless implementation; Power Main B achieved savings

Shape Aura case

Reinj implementation with a deviation on the discharge cooler temperature; Power Reinj achieved savings; the savings could have been greater if not for the temperature issue

For Main A, while the recommendation did not require any adjustments to this compressor, the operational team experienced issues with its Ps, resulting in an unexpected increase in Main A’s power consumption.

​

Despite this, the results indicate that recommendation #169 from Shape Aura contributed to overall energy improvements in the unit's gas plant. The recommendation led to an average energy consumption reduction. 

Shape Aura case
Shape Aura case

Recommendation #169 – Shape Aura Results

*Please note that, since PI and Shape Aura are based on average power consumption, results may vary slightly. 

bottom of page